Issues

History

The Clybourn Metra Station was constructed in 1900 and has long outlived its useful lifespan, yet it continues to operate as one of Metra’s most heavily used stations, ranked 22nd busiest systemwide and 17th busiest out of the “non-downtown” stations.

Its current infrastructure is simply not suitable for current needs, let alone any future ridership increases.  Renovations cannot address the following conditions due to site constraints:

  • No ADA / disability access and no ability to create complete access
  • Limited capacity due to length of existing platforms
  • No restrooms or indoor waiting areas
  • No dedicated “drop off” locations for taxis or ride shares; no increased parking

The station was constructed on a footprint designed for another era and did not account for the substantial growth of the surrounding, densely populated communities of Bucktown, Lincoln Park and Wicker Park, let alone the substantial growth of neighborhoods to the north and surrounding suburban populations that frequent the area serviced by the Clybourn Metra Station.

128 weekday trains currently stop at Clybourn, with ridership anticipated to double by 2050 due to the continued growth and appeal of the surrounding Bucktown, Lincoln Park and Wicker Park neighborhoods as well as overall increases in mass transit use.

A new station located in a better, nearby location for current and future mass transit needs is necessary to serve the surrounding communities.

Why Do We Need A New Station?

Now is the time to invest in the future.

The City of Chicago has already demonstrated its desire to foster the transformation of the former North Branch Industrial Corridor with its adoption of the North Branch Framework Plan in 2017. This Plan serves as a guide for the next several decades of long-term land use planning throughout the North Branch Corridor as it transitions from a legacy industrial footprint into a modern site with mixed use developments and increased density.

The current station lacks ADA access, and the existing footprint is incapable of supporting future access improvements given existing site constraints. Vehicular, pedestrian and cycling infrastructure is also limited.

There is limited parking and no practical ability to create additional parking on the site, and purchasing adjacent parcels to create added parking infrastructure is not feasible. High street traffic adjacent to the site creates a strong safety concern for pedestrians and bicyclists accessing the station.

The station is further confined by its location as it is limited in its ability to physically expand by adding further tracks. Given existing public and private infrastructure, including the nearby Kennedy Expressway, the Armitage / Ashland / Elston Avenue intersection, the inability to expand adjacent bridges due to height and drainage issues, and nearby commercial and residential property, the existing site is for all practical purposes land-locked.

Why not renovate the current station?

Rebuilding or substantially renovating the Clybourn Station at its existing location is not feasible given significant physical constraints.

To put it simply, the existing station was constructed in 1900 and is outdated and is not suitable for current use, let alone future ridership increases that will occur. The current station was designed for a different era, and its current location is simply not compatible with current, modern mass transit use, amenities and requirements.

The existing station does not meet ADA guidelines, having no ramps or elevators to aid those with mobility issues. It is one of 44 stations identified by Metra without ADA access in its “South, West and North System Map for Customers with Disabilities.” Of these 44 stations, Clybourn has the second highest ridership.

It is also difficult to access by most transportation modes as it lacks dedicated passenger unloading zones for taxis, ride-shares or carpool users. There are also no indoor waiting areas or restrooms for users.

The existing train platforms do not meet Metra’s current standards. The platforms vary from between 385 and 475 feet in length, which falls well short of Metra’s standards that call for platforms of 890 feet to service a 10-car train. Due to space constraints of the current station, these platforms are unable to be extended.

Overall, the physical space limitations of the current station are incompatible with any substantial renovations that may occur, particularly given the costs involved – it is a far better and more responsible use of resources to construct a new station in a nearby location.

What is needed?

Funding for a Phase 1 study has been secured via the appropriations process in the Illinois General Assembly. This is an important step but is merely the first step in a longer process.

We now need to advocate for this study to proceed at the earliest opportunity, and need to keep up the pressure to make sure this study moves forward.

The time is now to advocate for our elected leaders to lend their support to move this important study forward now.

How long will this Phase 1 Study take?

It is anticipated this phase will take roughly 18-24 months.

What are the next steps?

Now that funding for this Phase 1 study has been secured, it is important the study process itself moves forward. To ensure this study proceeds in short order, it is critical we advocate our elected leadership at the federal, state and local levels.

We encourage you to contact the following elected leaders and submit this letter of support:

Federal

State

Chicago

County

Clybourn Reimagined has been formed to advocate for such a vision.